3/11/2019

Renovations Update

We're getting to a really exciting stage with our basement renovation.  Framing is done, plumbing and electrical are mostly complete, insulation is done and drywall has started.  So things are really starting to take shape.  We've chosen our flooring and paint and some of the fixtures we've ordered have started to arrive.  My sink and counters for the wine room and our vanity are sitting in our storage room!



This is the luxury vinyl plank flooring we're going with and we're going with a grey carpet/walls.  Some of those color paint chips are for inspiration for the bathroom/laundry which we may do a different colour.  It's not pictured here but we've also chosen the tile for our Pellet Stove corner.  All in the flooring quote is $10,000 (installed) for around 1,200 square feet, plus stairs.  It's a bit more then we were hoping for - but the installer is also going to have to do some leveling work in the spaces where we are putting down the vinyl.

We're going to be tackling painting to add some sweat equity to the project and just need to confirm timelines with our contractor so we're ready for that.  It's going to be a lot of work for mostly Jordan as I'm usually on primary duty with the baby in the evening.

0 comments:

Post a Comment

Hi! Thank you for stopping by and leaving a message.

Links ♥